Bridge for transport of wind turbines
Our client Implenia Norge AS needed a temporary bridge for the transport of wind turbines into a local area, project Fløytdammen. They need to transport, hoist and assemble towers, turbines and transformers.
Janson Bridging has provided a temporary bridge to get the transports across a dam in a rural area near Bruvoll, Norway.
The bridge elements left Hank, the Netherlands on monday June 22 and arrived on site on time at Wednesday morning June 24.
A 200 ton crane was needed to unload and install the elements due to the limited access and working space.
Projektdata
Lösning
Elementbro
Typ
JSK
Total brolängd
15,7 mtr
Bredd
4,2 mtr
Höjd
0,45 mtr
Egenvikt
38 Tons
Type of traffic
Construction Traffic