Flyover bridge in Sierakowice

In order to secure the existing bridge in the town of Sierakowice during the transportation of oversized loads destined for the power plant in Rybnik, a temporary bridge JSK450, 13.5m long, was used as a 'Flyover' type bridge, that is, a bridge over the existing bridge. Installed and dismantled several times in the same place for the duration of subsequent night crossings, it allowed for the safe passage of loads weighing several hundred tons.

Share on:

Projektdata

Lösning
Elementbro
Typ
JSK-JBB
Längd
13,5m + ramps
Bredd
6m
Trafiklast
Super Heavy transports