S6 construction site bridge

To facilitate the work of construction vehicles on the construction site of the new S6 expressway near Słupsk, the general contractor (NDI S.A.) decided to use a professional temporary bridge over the Łupawa River. A thorough analysis of the situation indicated the JSB1 bridge as the most suitable solution - it was fully assembled in the Janson Bridging workshops and installed on site by NDI S.A. within a few hours.

Share on:

Projektdata

Lösning
Balkbro
Typ
JSB
Längd
24m
Bredd
3,5m
Trafiklast
Eurocode LM1
Balkbro