Heavy transport bridge Sweden
Our client called us because he had to transport a very heavy transformator in the area south of Stockholm. The special transport had to pass an existing bridge that was not strong enough for this load.
We provided a quick solution of a ‘bridge over a bridge’ and allowed the transport to pass the bridge.
Projektdata
Lösning
Elementbro
Typ
JSK
Solution
Heavy transport bridge
Längd
24 m
Bredd
3,6 m
Höjd
0,5 m
Rental period
1 night
Design load
435 ton special vehicle
![Elementbro](/images/content/products/490/image_4cbfab6112janson_bridging_jsk_normal.png)